|
|
| Cassidy Combined Arms Collective Training
Facility |
|
|
| Location:
Fort Campbell, KY |
|
| Client: U.S. Army Corps of
Engineers, Louisville District |
|
| |
|
This project includes design of an
urban city for company/battalion task force training. The city
contains a city center, a large industrial area, a school, and
neighborhood. These areas will be comprised of 39 buildings containing
business type establishments, residential homes, and industrial
facilities. The city will be designed to have several different
avenues of approach to maximize training. Utilities, including power,
water and data communications will also be included as well as a
control tower and after action review facility and administration
area.
This facility teaches the skills and unit cohesiveness necessary to
conduct clearing, breaching, offensive and defensive operations in an
urban setting. All targets are fully automated, utilizing
event-specific, computer-driven target scenarios and scoring. Targets
will receive and transmit digital data from the range operations
center. The captured data is then compiled and available to the unit
during the after action review. All targetry are life-like precision
targets that have reconfigurable plug and play capability.
|
|
|