[ Water Supply & Treatment ] [ Water Storage & Distribution ] [ Storm Water Rentention & Treatment ] [ Industrial Water Supply & Treatment ] [ Paving & Drainage ] [ Parks & Recreation ] [ HVAC Design & Inspection ] [ Urban Revitalization ] [ Airports ]
| Kennedy Lakes Well |
|
|
|
| Location: Okaloosa County,
Florida |
|
| Client:
Okaloosa County
Water and Sewer System |
|
| |
|
The Kennedy Lakes Water Supply Well is an integral part of the
Supplemental Water Supply Project for the Okaloosa County Water and
Sewer System. The water supply well is constructed to a depth of 710
feet and pumps water from the Floridian Aquifer. The pump setting is
216 feet deep and delivers 750 GPM to the distribution system that is
part of the supplemental water pipeline system. The water supply
plant includes chlorination to disinfect the water, a SCADA system
that monitors and controls the operations of the water supply plant, a
generator to provide auxiliary power to the entire plant,
pump-to-waste retention, and landscaping. In conjunction with the
construction of this well a Performance and Aquifer Test Analysis was
completed on the Floridian Aquifer and the Sand/Gravel Aquifer to
determine the long term impact to the Floridian Aquifer to construct
additional water supply wells as proposed by the Water Resource
Facilities Plan. Three (3) monitoring wells were constructed into the
Floridian Aquifer at distances of 100, 500, and 1000 feet from the
test well and a fourth monitoring well was constructed to a depth of
40 feet into the surficial zone. The test well was pumped for 72
consecutive hours with water levels monitored and recorded in all five
wells. This data was used to prepare a report that predicted long
term pumping impacts of the Floridian Aquifer which would be compared
to a Groundwater Modeling Report of the Mid-County Area prepared by
Polyengineering. The Aquifer Test results were compiled and a
Hydrogeological Report completed on the drawdown/recovery recorded in
all five (5) wells. The report findings correlated with the
Groundwater Modeling Report which resulted in the Water Resource
Program being approved by the Northwest Florida Water Management
District.
|
|
|